Spain: An Analysis of Country Energy Grids

SPAIN

Spain’s ability to accommodate accelerating electrification and renewable deployment will depend on timely implementation, improved network management and expanded flexibility.

Spain has a largely integrated national electricity system, with a single high-voltage transmission network operated by Red Eléctrica (REE) and regional distribution networks managed by more than 300 distribution companies. However, the market is dominated by a handful of major operators. Mainland Spain is interconnected with Portugal, France and Morocco, while the Balearic and Canary Islands operate separate or partially interconnected systems. REE manages electricity flows and balances supply and demand, while the independent regulator, the National Commission on Markets and Competition (CNMC), oversees network access, remuneration and regulatory compliance. The Ministry for the Ecological Transition and the Demographic Challenge (MITECO) is responsible for energy policy and transmission network planning.

Spain’s electricity grid accommodates a diverse, increasingly renewable-dominated generation mix. In 2025, renewables accounted for 56.6% of electricity generation, followed by nuclear power (18.1%) and natural gas-fired combined-cycle plants (16%), while coal contributed just 0.5%. Spain aims to increase renewable electricity to 81% by 2030 and achieve a fully renewable electricity system by 2050. However, integrating growing shares of variable renewable generation will require further investment in grid flexibility, storage and voltage management.

The grid generally operates reliably under normal conditions. According to REE, transmission network availability reached 98.38% in 2025, with only 12 transmission-related supply interruptions and an average interruption time of 0.25 minutes. However, these indicators exclude the exceptional blackout of 28 April 2025, which affected Spain and Portugal and disrupted telecommunications, transport and other essential services.

The European Network of Transmission System Operators for Electricity (ENTSO-E) described the blackout as Europe’s most serious electricity system incident in over two decades. Its March 2026 investigation identified multiple interacting causes, including power oscillations, inadequate voltage and reactive power control, differences in generator voltage regulation and cascading generation disconnections. The incident exposed weaknesses in system coordination rather than a fundamental inability to integrate renewable electricity. The International Energy Agency (IEA) also highlighted how interconnections with France and Morocco helped restore electricity supplies.

Cross-border connections remain a significant structural weakness. According to the European Commission’s 2026 Country Report, Spain’s electricity interconnection level is just 3.11%, far below the EU’s 15% target for 2030.[7] Although connections with Portugal function within the integrated Iberian electricity market, exchange capacity with France is limited to approximately 2.8 GW, restricting electricity trade and access to wider European system flexibility. The Bay of Biscay interconnection project, supported by €1.6 billion in European Investment Bank (EIB) financing, aims to increase Spain–France exchange capacity to 5 GW by 2028.

Cybersecurity is another area of concern. The Spanish National Cybersecurity Institute (INCIBE) recorded 122,223 cybersecurity incidents in 2025, a 26% increase from 2024. Of 401 incidents involving critical service operators, approximately 8% affected the energy sector. Although investigators found no evidence that a cyberattack caused the April blackout, they identified security vulnerabilities and deficiencies in the organizations examined, including inadequate vulnerability assessments and security logging. These findings indicate potential exposure but do not establish that the national grid could be compromised by a large-scale attack. The establishment of a dedicated MITECO–INCIBE industrial cybersecurity laboratory in 2026 represents a positive investment in resilience.

The grid’s capacity to accommodate future electricity demand and renewable deployment is increasingly constrained. Electrification is expected to accelerate electricity consumption, while connection capacity is already a major bottleneck. According to CNMC, over 60% of new demand and storage connection applications were rejected in 2024 because of insufficient distribution network capacity. Furthermore, REE reported that 11.05 GW of 18.52 GW of allocated transmission-grid demand connection capacity had not yet entered operation, indicating inefficiencies in capacity allocation and utilization. Renewable generation and storage projects also face connection delays.

In response, MITECO announced a proposed €17 billion-plus transmission network investment programme through 2030. Together with regulatory reforms to improve network planning and capacity allocation, this represents an important step. Nevertheless, Spain’s ability to accommodate accelerating electrification and renewable deployment will depend on timely implementation, improved network management and expanded flexibility.

 This post was submitted by Climate Scorecard Spain Country Manager, Tanyeli Sabuncu.

Learn More Resources

[1] CNMC, Census of Electricity Distribution Companies; Red Eléctrica, The Spanish Electricity System in 2025.

[2] Red Eléctrica (2026), Corporate Brochure: Spanish Electricity Generation Mix 2025, p. 7. Figures include estimated self-consumption.

[3] MITECO, Integrated National Energy and Climate Plan (PNIEC) 2023–2030.

[4] Red Eléctrica (2026), Spanish Electricity System Report 2025, sections on transmission network availability and energy not supplied. The April 2025 blackout is excluded from these indicators.

[5] ENTSO-E (March 2026), Final Report on the 28 April 2025 Blackout in Spain and Portugal.

[6] International Energy Agency (2026), Electricity 2026, chapter on reliability.

[7] European Commission (2026), Spain Country Report 2026.

[8] European Investment Bank (2025), EIB Supports the Bay of Biscay Electricity Interconnection Between Spain and France.

[9] INCIBE (2026), Balance de Ciberseguridad 2025.

[10] Government of Spain (2025), Informe no confidencial del Comité de Análisis de las circunstancias que concurrieron en la crisis de electricidad del 28 de abril de 2025.

[11] MITECO (January 2026), Inauguration of the Industrial Cybersecurity Laboratory.

[12] CNMC (11 June 2025), Access Capacity in Electricity Distribution Networks.

[13] Red Eléctrica (October 2026), Publication of Transmission Grid Demand Connection Capacity Maps.

[14] MITECO (September 2026), Proposed Electricity Transmission Network Investment Plan Through 2030.

x
x

Climate Scorecard depends on support from people like you.

We are a team of researchers providing information on efforts to reduce global emissions. We help make you better informed and able to advocate for improved climate change efforts. Donations of any amount are welcome.